• EN
  • NL
  • Home
  • Solutions
  • Projects
  • News
  • About us
  • Careers
  • Contact
  • Home
  • Solutions
  • Projects
  • News
  • About us
  • Careers
  • Contact
  • EN
  • NL
  • Home
  • News

News

The demand for more grid flexibility

The demand for more grid flexibility

In the Netherlands there is a fast-growing demand for extra capacity on the energy grid, mainly due to the rise of the a...
132 Gigawattpeak of solar panels required in 2050

132 Gigawattpeak of solar panels required in 2050

In a recent study, TNO updated the future scenarios for the Dutch energy supply, ADAPT and TRANSFORM, that were drafte...
Collaboration Agreement with Essent for sustainable hydrogen production

Collaboration Agreement with Essent for sustainable hydrogen production

A great day for the energy transition in the Netherlands: As of today, Solinoor and Essent will collaborate on the dev...
Double the production of green hydrogen

Double the production of green hydrogen

Dutch parties D66 & VVD want to double the production of green hydrogen from the originally agreed 4 Gigawatt to 8 Gig...
RVO allocates 13 billion euros for sustainable projects with SDE++ in 2022

RVO allocates 13 billion euros for sustainable projects with SDE++ in 2022

From June 28, the Stimulation Scheme for Sustainable Energy Production and Climate Transition (SDE++) will open for 20...
Concrete Plant Barneveld

Concrete Plant Barneveld

Solar Energy for self-consumption to overcome the grid capacity issues. 

Contact us

 Some of our projects

Considering nature and the environment, our projects contribute to a better, more sustainable world for the next generation. Find a selection of our projects below.

Solar park Geertjesgolf

A 4.2 MWp solar park on an old waste dumpsite whereby 100% of the produced energy will be used for sustainable sand extraction.

Barneveld Concrete Plant

By using batteries, we work towards a fully off-grid solution whereby 100% of the generated energy is consumed by the concrete plant itself.

Zaltbommel floating solar

A 2.85 MWp floating solar park on a water retention pond to power the local businesses. The construction starts in March 2023.

Projects overview

Visiting address

Waalbandijk 1
4053 JB IJzendoorn
The Netherlands

Contact

info@solinoor.com

+31 (0) 854 843 480

 
Share this page via:
Copyright © 2023 solinoor
  • Disclaimer
  • Sitemap