A 4.2 MWp solar park on an old waste dumpsite whereby 100% of the produced energy will be used for sustainable sand extraction.
By using batteries, we work towards a fully off-grid solution whereby 100% of the generated energy is consumed by the concrete plant itself.
A 2.5 MWp floating solar park on a water retention pond to power the local businesses. The construction starts in Q2 2023.
Early in 2023, a wooden solarcarport will be built near our office in IJzendoorn to provide renewable solar energy for electric mobility.
The installation of 296 solar panels in December 2021 provides the concrete plant in Tiel with more than 97 kWp of renewable energy for sustainable concrete production.
A 10 MWp floating solar park at a sand-extraction lake in IJzendoorn. This project is in the final permitting phase with the plan to be realised in 2023.
Floating solar energy, integrated with nature and the environment.This project is currently in the licensing phase.
The head office rooftop will be equipped with solar panels for the self-consumption of renewable energy.