A 2.5 MW floating solar park on a water retention pond to power the local businesses. The construction starts in Q2 2023.
A 4.2 MW solar park on an old waste dumpsite whereby 100% of the produced energy will be used for sustainable sand extraction.
By using batteries, we work towards a fully off-grid solution whereby 100% of the generated energy is consumed by the concrete plant itself.
A 10 MW floating solar park at a sand-extraction lake in IJzendoorn. This project is fully permitted and planned to be realised in the following months.
A 12.8 MW floating solar park on the floodplains of Ochten. This project is currently in the development phase.
In 2023, a wooden solarcarport will be built near our office in IJzendoorn to provide renewable solar energy for electric mobility.
The installation of 296 solar panels in December 2021 provides the concrete plant in Tiel with more than 97 kW of renewable energy for sustainable concrete production.
A 3.6 MWp floating solar park integrated with nature and the environment.This project is currently in the licensing phase.
The head office rooftop will be equipped with solar panels for the self-consumption of renewable energy.
Contact